Baoding Huazheng Electric Manufacturing Co., Ltd. is the export of electrical testing equipment.
Huazheng Electric Manufacturing (Baoding) Co., Ltd.
Huazheng Electric Manufacturing (Baoding) Co., Ltd. was established in 2008 and is located in Baoding City, Hebei Province, a famous historical and cultural city in China. Its main business is the production, manufacture and sales of electrical equipment and testing instruments.Our company provides professional power equipment for the State Grid, municipal departments, power engineering companies, transformer factories, cable factories, laboratories, power testing service companies, substations, etc.The company has strong technical force and advanced production equipment, and has a mature and professional international trade team, providing one-stop, all-weather services for global customers.
Our products have been exported to clients in such countries and regions as USA, Brazil, Chile, Vietnam, Indonesia, Korea, Turkey, Dubai, South Africa .
Huazheng Electric is honored to participate in the IEEE PES T&D Conference & Exposition, the world’s most influential international event in the power transmission and distribution industry. As a professional manufacturer and supplier of power electrical testing equipment, we have long been
7 days of deep cultivation, 300 hours of precise docking, in-depth dialogue with energy partners from 23 countries - Huazheng Electric's journey in Africa has reached another milestone! During our trip to ENLIT AFRICA, we focused on transformer health management and delivered a remarkable report
We have successively established good cooperative relations with overseas customers such as Korea, Japan, Great Britain, South Africa and Kenya.
In many remote outdoor sites where newly built substations have not yet been powered on or have power outages for maintenance, searching for a usable 220V maintenance power socket often requires pulling a temporary cable reel of hundreds of meters, which not only slows down the maintenance pace, but
VIEW MORE
The most painful part of conducting a 10 hour rate battery capacity discharge test at a substation is staying up late on duty: starting to discharge during the day, it often takes until midnight or even early morning to complete the discharge. Under traditional operation, the tester must stay on sit
VIEW MORE
In the SF6 equipment inspection reports of substations, two units often appear simultaneously: dew point temperature (°C) and moisture content (μl/l or ppm). For the same instrument, these two values refer to the same thing but are expressed differently. Understanding the relationship between them
VIEW MORE